Outsourcing >

SSI Quality Process Overview Customer Satisfaction Our Engineers Questions to Ask Technical Lab Testimonials Whitepapers
SSI Embedded Systems Trust Facts

Fact: Over 50% of SSI Staff has 8 or More Years Experience

"You can count on the work being done right and on time." ~ SSI Client

Fact: 30% of SSI staff has twelve or more years experience

"The people blended in and became part of the design team."

Fact: Experienced Team Lead manages all projects

"I was impressed with the quality of SSI's work throughout this contract. I appreciated their ability to work with minimal guidance, and minimal design details. And I greatly appreciated their suggestions and alternate design proposals. Their willingness to work overtime when necessary to meet deadlines was greatly appreciated." ~ SSI Client

Fact: All SSI staff is trained on the Quality Development Process

"Work is spectacular. More exceptional than I thought it would be. Sensors work great. They can detect the slightest pressure accurately. It is WAY beyond my expectations." ~ SSI Client

Fact: Long term staff retention rate at SSI is > 95%

Fact: SSI's Internal Software process operates as CMM Level 3

"The experience was a good one" ~ SSI Client

Fact: SSI has been in business 16+ years

"The best thing about working with SSI is that the people genuinely care about the success of the overall project. Typical contractors stop when they have merely met the letter of the contract that they are bound to; where as, SSI is willing to go above and beyond to drive a project to completion and ultimately success." ~ SSI Client

Fact: Over half of SSI Business is from returning clients

"I would use SSI again" ~ SSI Client

Fact: SSI client relationships last several years

"The best thing about working with SSI is that the people genuinely care about the success of the overall project. Typical contractors stop when they have merely met the letter of the contract that they are bound to; where as, SSI is willing to go above and beyond to drive a project to completion and ultimately success." ~ SSI Client

Fact: SSI's Customers report a consistent 4.5 out of 5 rating for satisfaction

"Keep finding people who can get to the root of the issue and resolve it as specified. [Your Engineer] is golden!." ~ SSI Client

Fact: 100% of clients surveyed said they would recommend SSI to others

"SSI will deliver what is promised on a timely basis." ~ SSI Client

Fact: SSI Supports Continual Employee Training

"Consistent high quality engineers who perform very well. SSI is the only company -- contracting or consulting -- who consistently provides the best talent who are not only technically accomplished but have excellent verbal and personal skills. I have not seen anything like it before." ~ SSI Client

SSI Embedded Trust Facts

Outsourcing Engineering Without Losing Control

7 Tips to Success for Outsourcing without Loosing Control

By Michele Mordacq
President/CEO, SSI Embedded Systems

SSI Embedded Systems Programming provides development services to a variety of customer types.  Some companies are experts on developing new products, and need a few extra resources to add skills, talent or maybe extra hands to get a project that is running behind back on schedule.  Other customers have no idea how to develop a product and get it to market, and they require guidance and advice from outside experts.  Whatever the case, it is important to follow some ground rules when outsourcing any piece of work so you don’t loose control.  These 7 tips can help.

Tip #1: Find the person or company whose skills match your needs

The key criterion for a successful relationship is to find someone who has the technical experience to accomplish the task.  Ask about the same or similar projects they have completed in the past.  Beware of companies that promise you anything and everything.  A jack of all trades is master at none.  Make sure they understand HOW to run a project and how they have kept previous projects on track.

Tip #2: Have a contract for exactly what will be delivered

Once you’ve selected the perfect vendor and have confidence in their skills, a written contract or project agreement will assure that expectations, milestones, documentation, and deliverables are met. Include what documents you expect, how the code will be delivered, and what supporting documents will be required once the finished product is brought in-house.  If hardware or tools are needed, who provides them?  Who will own them at the project completion?

Tip #3: Create a schedule with trackable milestones

Projects do not meet a projected time schedule unless there is a plan.  Have a schedule of deliverables with major milestones highlighted.  There should be a weekly or bi-weekly status call to report on the progress and discuss any issues that come up. Good communication is key.

Tip #4: Get requirements, a design approach, or solutions in writing

Quality development starts with a clear idea of what has to be done and how it will be achieved.  Requirements Documents are useful in outlining IN DETAIL how the new product or feature will work – helping to alleviate any misunderstanding.  In large projects, SSI suggests formal Architecture and Design Documents that show how all the features fit together.  Smaller projects can have informal documents or even drawings or pictures. 

Tip #5: Insist on frequent deliverables of code and documents as the project proceeds

Tip #2 stresses the importance of outlining all product deliverables.  But do not wait until the end of the project before you receive documents or code.  What if something happens and the project ends suddenly?  What if you need to get additional resources involved?  Do you have access to the work completed to-date to make these decisions?  Current software releases can be placed in a source control system, if appropriate, so that multiple versions can be archived.  This will help eliminate risk.

Tip #6: Understand the tools needed to recreate the environment

Once the project is complete and the finished code is delivered, what happens if changes are needed?  Maybe 6 months later, a bug is found or a new feature is required.  If the previous developer is not available, what can you do?  It is always possible to find someone else to pick up the project, but they will need access not only to the finished design but also the tools used to create it.  A Build Environment Document lists all tools used (including versions): how to compile and load code, tools used for debugging, and how to test.  Documentation allows developers to quickly recreate the development and test environment and efficiently acclimates them to the current project so progress can continue without delay

Tip #7:
Track bugs and open issues

Keep lists of Bugs and Open Issues to keep you informed of problems and their status.  Sometimes, important information gets lost in a flurry of emails without a concrete place to note the most recent status.  Often, the end product is released with minor known bugs, so it is good to have a list for notation so in the next release they can be addressed. Ideally, there is also a Test Plan that tells how the project was verified.  Features not working correctly are added to the Open Issues List.  With proper documentation and a complete history, everyone has knowledge about the level of quality at all times.

SSI's development team always follows our defined Quality Development Process. This ensures proper management of all documents and code that keep our clients informed and in control. View SSI’s page on Quality Project Development for details.

 

 

SUBSCRIBE TO NEWS & EVENTS
The Real Time Review brings you the latest embedded software news and technical articles - published approx. six times throughout the year.
> VIEW ALL NEWS

RSS Feed
A Certified Women's Business Enterprise and Member of the Illinois Technology Association